Projective was appointed to design and deliver a modern steam generation solution for a pharmaceutical manufacturing site. The existing fire tube boilers, installed over three decades earlier, were no longer aligned with the site’s operational needs. As the facility evolved, the steam system had become inefficient, oversized and increasingly difficult to maintain.
The objective was to: replace the outdated infrastructure with a right-sized, future-ready solution that would improve performance, reduce emissions and support long-term operational resilience.