Projective’s tailored efficiency plan targeted the site’s most energy-intensive systems. The team redesigned the hot water pipework to enable heat reuse, significantly cutting thermal waste. Insulation upgrades and boiler simplification further reduced energy losses, while a full optimisation of the compressed air system improved reliability and reduced unnecessary load.
A Combined Heat and Power (CHP) system was also proposed, precisely matched to the site’s demand profile. This solution not only enhanced energy resilience but also unlocked long-term cost savings. Together, these interventions delivered a 30% reduction in energy consumption, all achieved without disrupting production.