Projective’s engineers applied their Intelligent Engineering System (IES) to assess the Chiller System in a full operational context. Rather than replacing ageing assets, Projective focused on optimising performance across the entire system, delivering a smarter, lower-cost solution.
By identifying and eliminating inefficiencies, we enabled the safe decommissioning of equipment without environmental impact or production risk. The result was a £600,000 capital expenditure avoided, alongside £25,000 in annual savings through improved energy and water efficiency.
Projective’s independent, engineering-led approach ensured the client received a solution based on need, not product, unlocking long-term value and freeing up capital for growth.