Decarbonising Critical Infrastructure
Two critical buildings were still tethered to a central utility plant that was nearing the end of its life. That alone posed a risk to long-term operations. But the bigger issue was strategic…
Case Study
Two critical buildings were still tethered to a central utility plant that was nearing the end of its life. That alone posed a risk to long-term operations. But the bigger issue was strategic…
Case Study
A key manufacturing site in the US was facing mounting pressure. Two essential capital projects, focused on safety and emissions, were weeks behind schedule…
Case Study
Heineken engaged Projective to carry out a major overhaul of the CO2 recovery plant at a large brewery. We applied…
Case Study
Projective was appointed to design and deliver a modern steam generation solution for a pharmaceutical manufacturing site…