Case Study

Read more

Capital Preserved – Avoiding €2M in Unnecessary Expenditure

At a major European pharmaceutical manufacturing site, the arrival of summer triggered significant operational anxiety. The chilled water system, vital for maintaining strict temperature…

Case Study

Read more

47% Cost Reduction Through Smarter Pumping Solutions

Faced with rising operational costs and complex groundwater dynamics, a UK-based water treatment site…

Case Study

Read more

Engineering Efficiency for a Global Pharma Site

Faced with rising energy costs and a projected doubling of their £4 million annual utility spend, a global pharmaceutical manufacturer sought a solution that would…

Case Study

Read more

Strategic Cooling System Upgrade & Energy Optimisation

Two secondary manufacturing sites in Ireland were operating high-energy chilled water systems, consuming over 5GWh annually…

Case Study

Read more

Reducing Cost of Goods in Food Manufacturing

Food manufacturing is one of the most energy- and water-intensive sectors in the UK, with utility costs accounting for up to 15–20% of total production expenses…

Case Study

Read more

£625K Saving on Chiller System Capital

A 500-employee manufacturing site, part of a £21 billion global corporation, was facing a major capital investment. A third-party consultant had advised immediate replacement…

Case Study

Read more

29% Energy Cut in Compressed Air System

Compressed air is a key utility for all Pharmaceutical manufacturing sites, consuming a considerable amount of electricity. Our UK-based client, part of an FTSE 100 company…

Case Study

Read more

Brewery Boiler Upgrade Delivers £256K Annual Savings

When a leading global brewery set out to reduce energy costs, improve reliability, and meet ambitious sustainability targets, they turned to Projective…

Case Study

Read more

More Performance Without Capital Spend

At one of the client’s key UK manufacturing sites, chiller plays a critical role in supporting product packaging operations. The site team had observed signs of limited cooling capacity during…

Case Study

Read more

Decarbonising Critical Infrastructure

Two critical buildings were still tethered to a central utility plant that was nearing the end of its life. That alone posed a risk to long-term operations. But the bigger issue was strategic…

Case Study

Read more

Time Saved, Value Delivered

A key manufacturing site in the US was facing mounting pressure. Two essential capital projects, focused on safety and emissions, were weeks behind schedule…

Case Study

Read more

Projective Delivers £425,000 Annual Savings and Reduced Water Consumption

Heineken engaged Projective to carry out a major overhaul of the CO2 recovery plant at a large brewery. We applied…